Virilla Bridge With
Partial Closures On Saturday
The Virilla bridge over the autopista
General Cañas continues to be a shame for
the country, as one of the most transited,
continues to with a gap in one of the spans
and now with a broken concrete railing that
could lead a vehicle or pedestrian to drop
hundreds of metres into the Virilla river
below.
The "platina" bridge has it has come to be
known will be closed of on March 13 for work
crews to repair the railing after a truck
slammed into it last week.
Affected will be one lane in the Alajuela -
San José direction from 4am on Saturday to,
well, when the work is finished, according
to the Ministerio de obras Públicas y
Transportes (MOPT), which expects not to
take more than a day.
MOPT officials assure that the break in the
railing does not compromise the structural
integrity of the bridge and the work to be
carried out on Saturday is not related to
the "platina".
|
|
|
|
|
| |
|
|
|
|
|